How we run your project — from order to start-up, for a single machine or a complete line
Buying a filling machine is a project, not a purchase. Whether you order one semi-automatic filler or a complete line, what usually goes wrong is not the machine: delays nobody saw coming, changes agreed by phone and forgotten, problems found only at installation, and technicians waiting at a site that is not ready. AiCROV, the filling machine manufacturer in Tarragona, Spain, runs every order with its own method, the PEP (Project Execution Process), built precisely to prevent these problems, from order confirmation to start-up at your plant.
What can go wrong in a filling machine project, and what the PEP does about it
| Risk for you | What the PEP does |
|---|---|
| You do not know where your project stands | One project manager is your single contact, and you receive a monthly project report with progress, milestones and open points |
| Delays appear late, when nothing can be done | Every stage has a responsible person and a gate that must be passed before the next stage starts |
| Changes agreed informally become disputes | Every change of scope is agreed and documented formally, with its effect on time and cost |
| Problems are discovered at your plant | Your machine is tested twice in our workshop: an internal test (IFAT), stricter than yours, and then the FAT with you |
| Technicians arrive and the site is not ready | A site readiness check is done with you before anyone travels |
| Small issues are forgotten | A punch list records every open point, assigns it to someone and follows it until it is validated and closed |
| Missing documentation at handover | You receive complete, traceable documentation of your machine or line |
The five stages of every AiCROV project
- Kickoff. After the order, a kickoff meeting with you fixes scope, milestones and contacts.
- Engineering and pre-production. Detailed mechanical, electrical and software design for your products and containers, purchasing, and, in a complete line, coordination of every third-party machine.
- Manufacturing, assembly and testing. Your machine is built and assembled in Tarragona. It first passes our internal test (IFAT), and only then the Factory Acceptance Test (FAT) with you, with your containers and, where possible, your product.
- Logistics and delivery. The machine is packed, documented and shipped, after the site readiness check.
- Installation, commissioning and SAT. Our technicians install and start up the machine, train your operators and complete the Site Acceptance Test (SAT) with you. During installation, every critical point has an action assigned before the end of each day.
Every stage has defined steps, a responsible person and a gate. A punch list runs across all stages, so no open point is left without an owner and an action.
How we keep you informed
- One contact: a project manager coordinates the whole project with you, in English, Spanish, Catalan or French, and in Arabic or Hindi depending on your region.
- Kickoff meeting at the start, and a monthly project report with progress, milestones and open points.
- Formal communication at each key milestone: FAT, site readiness, delivery and closing.
- During installation: daily follow-up of every critical point.
Built to get better with every project
The whole PEP runs in Zoho Projects, so every decision, change and incident leaves an auditable record. AiCROV is currently implementing an ISO 9001 quality management system, and the PEP is part of it. The PEP is not a static document: we review it after every project, so each machine we deliver benefits from what we learned on the previous ones.
After start-up, the same team supports your machine with remote assistance, spare parts and maintenance plans.
Frequently Asked Questions
What happens after I order a filling machine from AiCROV?
The project follows the AiCROV Project Execution Process (PEP): kickoff meeting, engineering and pre-production, manufacturing and testing (internal IFAT, then FAT with you), logistics and delivery after a site readiness check, and installation, commissioning and SAT at your plant. A single project manager coordinates everything and sends you a monthly project report.
Is the PEP only for large turnkey lines?
No. Every order follows the PEP, from a single semi-automatic filler to a complete turnkey line. The stages are the same; a complete line simply has more machines to coordinate.
What is the difference between IFAT, FAT and SAT?
The IFAT is our internal test of the machine or line, stricter than the customer test, and its critical points must be closed before the FAT. The FAT (Factory Acceptance Test) is done with you in our workshop in Tarragona before shipment. The SAT (Site Acceptance Test) is done with you at your plant after installation.
Can I attend the FAT?
Yes. The FAT is done with you, with your containers and, where possible, your product.
How are changes to the project handled?
Every change of scope is agreed in writing, with its effect on time and cost, before it is carried out.
Who will be my contact during the project?
A project manager, who coordinates engineering, purchasing, production, logistics and service with you from kickoff to closing.
What is a site readiness check?
Before our technicians travel, we confirm with you that the site is ready for installation. This avoids wasted trips and delays.
What documentation do I receive?
Complete, traceable documentation of your machine or line at handover.